Consultationto handover.Seven stages.

Consultation to handover in seven stages, with one project manager the whole way through. Here is what happens at each one, what you receive, and where projects actually slip.

Carnes Hill Doctors · reception
7Stages, start to finish
One point of contact
0
Stages, start to finish
0
Projects run this way
0
Point of contact
0m²
Delivered

Most clients have been through a build before, and most have a story about it. A date that moved twice. A variation nobody warned them about. A site contact who stopped answering. The process below exists because those things are preventable, and almost all of them are prevented before construction starts rather than during it.

Two stages do most of the work. Consultation, where we establish what the practice actually has to do, and Acquisition, where we test whether the tenancy can carry it. Get those right and the rest is sequencing. Get them wrong and no amount of site management recovers it.

The cheapest advice we give is telling you a site will not work.

Toongabbie Doctors — consult corridor
Toongabbie Doctors · consult corridor
7Stages, start to finish

Seven stages, start to finish.

Scroll, or jump to any stage. Each one shows what happens, what you receive, who is in the room — and what we need from you.

01/07 Consultation
Before design
01

Consultation

We sit down with the scope, the tenancy and the business case. What disciplines, how many rooms, what equipment, what opening date. We ask what the practice has to do on day one, and what it has to be able to do in year five.

Carnes Hill Doctors — consult room
Carnes Hill Doctors · consult room
What you receiveA written brief, an indicative cost range and an honest read on whether the site can carry it.
You, the practice principal, our director and project manager
From your side
  • Your discipline mix and target consult count
  • Any equipment already selected or under offer
  • The lease position — signed, under offer, or still looking
  • Your target opening date and why
Before you sign
02

Acquisition

If the tenancy is not settled, we assess options against the brief — floor-to-ceiling height, switchboard capacity, hydraulic and exhaust access, structure, accessible entry, and the position of the core. The cheapest advice we give is telling you a site will not work.

Burwood Brickworks Medical Centre — consult corridor
Burwood Brickworks Medical Centre · consult corridor
What you receiveA site assessment against your room schedule, and the specific reasons a tenancy passes or fails.
Project manager, services consultants, your agent or landlord
From your side
  • Access to inspect the tenancy
  • The lease or heads of agreement, including the fitout guide
  • Base-building drawings if the landlord has them
  • Shortlist of sites if you are comparing
Weeks 1–3 typically
03

Concept Design

The room schedule becomes a plan. Patient arrival, reception sightlines, clinical flow, staff movement, the sterilising sequence and where support rooms sit relative to the people using them. We iterate it with you until it reflects how the day actually runs.

Mulwaree Doctors — interior
Mulwaree Doctors · interior
What you receiveConcept plan, room schedule, finishes direction and a firmer cost position.
Design and documentation team, you, your clinical leads
From your side
  • Time with whoever runs the practice day to day
  • Equipment schedules and supplier templates
  • Your patient-area electrical classification
  • Any brand or finishes direction you want held to
The most common cause of slippage
04

Approvals

We establish whether the works are exempt, complying development or need a development application, and we manage the lodgement and the response. Where a licensed facility is involved, plans go to the health department before a licence application can even be made.

Cranbourne West Medical Centre — consult corridor
Cranbourne West Medical Centre · consult corridor
What you receiveLodged application, certifier engaged, and a programme built around the real assessment period.
Project manager, certifier, council or private certifier, health department where applicable
From your side
  • Owner’s consent from the landlord
  • Company and licence details for the application
  • Sign-off on the documented plan — changes after lodgement are expensive
  • Your radiation assessment, where imaging is involved
The part people picture
05

Construction

Delivered by the team that documented it. Trades sequenced, services set out to the equipment templates, inspections called at the right hold points. Where the practice is trading, staged and contained around clinical hours.

Toongabbie Doctors — room signage
Toongabbie Doctors · room signage
What you receiveWeekly progress reporting, photographs, and a site contact who answers the phone.
Site manager, leading hands, subcontractors, superintendent
From your side
  • One decision-maker we can reach during the working day
  • Site access and after-hours arrangements
  • Confirmed equipment delivery dates
  • If you are trading, your appointment pattern by day
Overlapping construction
06

Service Preparation

Equipment delivery and installation coordinated with the vendors, commissioning of mechanical, electrical and hydraulic services, patient-area electrical testing, and the compliance documentation assembled for certification.

Botanic Ridge Doctors — exterior
Botanic Ridge Doctors · exterior
What you receiveCommissioned services, test certificates and equipment installed and working.
Project manager, equipment suppliers, services contractors, certifier
From your side
  • Vendor installation bookings confirmed
  • Your IT and phone provider scheduled
  • Signage and branding artwork
  • Staff walk-through booked before handover
Opening day
07

Handover

Occupation certification, fire and essential services certification, as-built documentation, operation and maintenance manuals and the keys. Then the defects period, run by the same people who built it rather than handed to someone who was not there.

Armstrong Creek Doctors — exterior
Armstrong Creek Doctors · exterior
What you receiveCertificates, as-builts, O&M manuals, warranties and a defects contact.
Project manager, certifier, you
From your side
  • A nominated person to receive the handover pack
  • Your cleaning contractor briefed for the first clean
  • A defects list after the first fortnight of trading
  • Permission to photograph the finished practice

Where projects actually slip.

Four things cause most of the lost time on a healthcare build. None of them is the construction. Open any card for how we handle it.

Inspections, testing and handover.

Framing, services rough-in, waterproofing and pre-lining inspections are called at defined hold points, not retrospectively. Where a certifier requires a critical stage inspection, the programme allows for it rather than absorbing it.
Where AS/NZS 3003:2018 applies, body-protected and cardiac-protected areas are tested and certified before handover. The classification is the facility's decision, which is why we ask for it before first fix.
Occupation certification, fire safety and essential services certification are coordinated to land on your opening date. On a licensed facility in New South Wales a final inspection also verifies the build against the plans the Ministry approved.
The defects period runs with the people who built it. As-built documentation, O&M manuals and warranties are handed over as a set, not chased afterwards.
A note on complianceGeneral information about the regulatory environment we build in, current as at October 2026 — not legal, regulatory or professional advice. Requirements change and differ by state. Accreditation, licensing and radiation approvals rest with the practice and its own advisers.

Process: common questions.

Construction on a standard practice is measured in weeks. The full process — consultation through handover — is usually measured in months, and approvals and long-lead equipment, not the build, are what set the date. We give you a programme at concept stage with the assessment period shown as a fixed item.
After the room schedule and finishes standard are settled and we have inspected the site. Anyone who gives you a fixed price before those three things is pricing a guess, and the guess becomes variations.
One project manager, from consultation to the end of the defects period. You are not handed from a sales contact to an estimator to a site manager.
It is raised with you, priced, and agreed before it is done. Older tenancies carry genuine unknowns, which is why we inspect before pricing and carry a stated contingency rather than a thin number.
Yes, and the cost and programme impact is put in writing before it is agreed. On a licensed facility it is more constrained, because the finished building is inspected against the plans the department approved.
We establish the pathway, engage the certifier and manage the lodgement and responses. The assessment period itself belongs to the authority, and we will not pretend to control it.

Stage one costs you nothing.

Send us the tenancy and the scope. We will come back with a room schedule, a compliance read and a realistic cost range — and tell you early if the site cannot do what you need.