Doctors&Co Fitouts
Free Consultation
Book Free Consultation
Mambourin Doctors — reception
The Peninsula Medical and Dental Centre — reception
Burwood Brickworks Medical Centre — waiting area

Nine disciplines.Nine complianceenvelopes.

A fitout is clinical infrastructure before it is an interior. Every discipline carries its own standards, its own equipment and its own patient journey — and the difference between them is decided on the floor plan, not in the finishes schedule.

Mambourin Doctors · reception
38Healthcare projects completed
Nine disciplines
0
Projects completed
0m²
Delivered
0
Consult rooms built
0
States · NSW VIC QLD

Most builders treat healthcare as commercial fitout with more sinks. It is not. A dental surgery is a services set-out problem. An imaging suite is a shielding assessment the regulator has already approved. A pathology laboratory is a directional airflow diagram. A licensed day procedure centre is a set of drawings a government department signs off before you may even apply for your licence.

Doctors&Co Fitouts has completed 38 healthcare projects across New South Wales, Victoria and Queensland — 18,253 m² and 431 consult rooms. The pages below set out what each discipline requires, which standards apply, what drives the cost, and — where we have built it — the projects and room schedules to back it up.

Nine disciplines. Nine compliance envelopes. One delivery team.

Carnes Hill Doctors — reception
Carnes Hill Doctors · reception
38Projects completed

Who we build for.

Each page carries the technical requirements, the named standards, the real project evidence and the questions practice owners actually ask.

Mambourin Doctors — reception
Mambourin Doctors · reception

Medical Centre Fitouts

We build the practices Australian GPs work in — from a six-room suburban clinic to a 25-consult super centre with pathology and allied health…

35 projects · 17,171 m²
Cheltenham Dental Care — dental surgery
Cheltenham Dental Care · dental surgery

Dental Fitouts

Thirty-one dental surgeries built across eight completed clinics — standalone practices and dental wings inside larger medical centres, in…

8 projects · 6,546 m²
The Peninsula Medical and Dental Centre — treatment room
The Peninsula Medical & Dental Centre · treatment room

Radiology & Imaging Fitouts

Imaging suites where the shielding, the slab and the patient pathway are resolved before the first wall goes up — including a standalone 175…

2 projects · 998 m²
Armstrong Creek Doctors — treatment room
Armstrong Creek Doctors · treatment room

Day Surgery & Licensed Facility Fitouts

Licensed facilities are the one healthcare build where the regulator approves your drawings before you may apply for a licence — and inspects…

Capability
Burwood Brickworks Medical Centre — waiting area
Burwood Brickworks Medical Centre · waiting area

Pharmacy Fitouts

Standalone pharmacies and co-located dispensaries inside medical centres — including a 540 m² pharmacy at Toongabbie with a confidential…

2 projects · 2,240 m²
Toongabbie Doctors — consult corridor
Toongabbie Doctors · consult corridor

Pathology Laboratory Fitouts

A 775 m² diagnostic laboratory at Macquarie Park — PCR, molecular serology, microbiology, histopathology, dark room, cold room and specimen…

1 project · 775 m²
Toongabbie Doctors — staff amenity
Toongabbie Doctors · staff amenity

Allied Health Fitouts

Eleven of our completed projects include allied health — physiotherapy and rehabilitation gyms, psychology rooms, chiropractic suites and…

11 projects · 7,364 m²
CryoSubZero — cryotherapy chamber
CryoSubZero · cryotherapy chamber

Wellness & Preventative Health Fitouts

Salt therapy rooms, an infrared sauna, an oxygen hyperbaric chamber, red light therapy and change facilities — built at Cheltenham as one…

1 project · 1,500 m²
Armstrong Creek Doctors — lobby
Armstrong Creek Doctors · lobby

Commercial & Office Fitouts

Office and corporate tenancies built to the same standard as the clinical floors above them — including two office tenancies on the ground…

1 project · 1,500 m²

What applies across all nine.

NCC 2025 was published on 1 May 2026. Victoria adopted it from that date. New South Wales and Queensland deferred adoption to 1 May 2027, so projects in those states are currently certified under NCC 2022. Because we build across all three, we confirm the edition in force before documentation starts.
Accessible paths of travel, door clearances, circulation space and accessible sanitary facilities are Deemed-to-Satisfy provisions under the Code, calling up AS 1428.1. In healthcare they carry a practical weight the minimum dimension does not capture.
AS/NZS 3003:2018 governs electrical installations where low-voltage medical electrical equipment is used on a patient. Whether a room is body-protected or cardiac-protected depends on the procedures and equipment — AS/NZS 2500 guides it and the decision rests with the facility. Settle it before first fix.
For practices accredited against the RACGP Standards for general practices (5th edition), Commission reporting covering April 2023 to April 2026 shows infection prevention and control — including sterilisation — among the most frequently unmet indicators at accreditation. A one-way reprocessing room is a layout decision made at design stage.
Shielding for X-ray, OPG, CBCT and CT is assessed by your state radiation regulator against a scale plan showing the room, equipment, workload and the occupancy of adjoining areas including above and below. ARPANSA tests equipment and shielding materials; it does not approve your room.
Private health facility licensing, NATA/RCPA accreditation against AS ISO 15189:2023, RACGP accreditation and pharmacy authority registration are granted to the operator, not the builder. We build to the approved documentation and are specific about which parts of compliance the building controls.
A note on complianceGeneral information about the regulatory environment we build in, current as at October 2026 — not legal, regulatory or professional advice. Requirements change and differ by state. Accreditation, licensing and radiation approvals rest with the practice and its own advisers.

Tell us the discipline. We will tell you the site.

Send us the tenancy and the scope and we will come back with a room schedule, a compliance read and a realistic cost range — including whether the site can take what you plan.

Secret Link